두남개발

두남개발 1호 해상 크레인


250TON 크레인

선체 제원표

전 장 58M 경하흘수
선 폭 21M 만재흘수
깊 이 3.5M ANCHON 중량 3TON / 4EA
총 톤 수 938TON 윈치 2 EA
적재용적 그랩
적 재 톤 BOOM 길이 18M~57M


두남개발 1002호 정격 총하중표 주권 250ton

작업반경
(m)
BOM LENGTH(m)
18.0 21.0 24.0 27.0 30.0 33.0 36.0 39.0 42.0 45.0 48.0 51.0 54.0 57.0
8.0 250.0
9.0 235.0 235.0
10.0 220.0 200.0 180.0
12.0 195.0 181.1 173.2 162.8 152.5
14.0 170.0 163.2 156.4 148.7 141.3 135.7 130.0 124.7 118.6 112.9
16.0 147.0 143.5 139.5 134.7 130.0 125.3 120.6 115.3 110.6 105.9 101.2 96.5 91.8
18.0 130.0 127.3 124.5 117.3 118.7 114.6 111.3 107.9 104.5 101.1 97.7 94.3 90.9 87.5
20.0 117.5 115.0 112.5 109.7 107.5 104.7 101.9 99.1 96.3 93.5 90.7 87.9 85.1 82.3
22.0 101.5 99.3 97.1 94.8 92.5 90.2 87.9 85.6 83.3 81.0 78.0 75.0
24.0 93.9 91.5 89.5 87.6 85.8 84.0 82.2 80.4 78.6 76.8 75.0 73.2
26.0 85.5 82.3 80.3 78.3 76.3 74.3 72.3 70.3 68.3 66.3 64.3
28.0 76.7 74.9 73.1 71.3 69.5 67.7 65.9 64.1 62.3 60.5
30.0 71.5 69.8 68.1 65.8 63.5 61.2 58.9 56.6 54.3 52.0
32.0 65.8 64.1 61.4 68.7 56.0 53.3 50.6 47.9
34.0 61.8 60.7 58.9 56.2 53.5 50.8 48.1 45.4


공사실적

  목포 북항 선착장 공사 (동화)       2016년 03월
  영광 안마항/도선항 축조 (목포지방해양수산청_나래종합건설)       2016년 05월
  추자도 신앙항 축조 (두산중공업_삼우개발)       2016년 09월 ~ 2016년 11월
  서귀포 위미항 보수 (세기건설_삼우개발)       2016년 11월 ~ 2016년 12월
  서남해 해상풍력 실증단지 축조       2017년 08월 ~ 2017년 11월, 2018년 04월 ~ 2018년 11월
•  강릉 안인화력1,2기 연료부두축조       2019년 04월 ~ 현재 진행중

두남개발 5호 해상크레인


160TON 크레인

선체 제원표

전 장 50.9M 경하흘수 1.3M
선 폭 22M 만재흘수 3.0M
깊 이 4M ANCHON 중량 3 TON
총 톤 수 978TON 윈치 4 EA
적재용적 1,200m² 그랩 2.0m²(12TON)
3.0m²(7TON)
적 재 톤 2,000 TON 오랜지버켓 3.0m²(10TON)


두남개발 5호 정격총하중표 주권 160TON

작업반경
(m)
22m 25m 28m 31m 34m 37m 40m 43m 46m
각도
( ” )
정격
총하중(t)
각도
( ” )
정격
총하중(t)
각도
( ” )
정격
총하중(t)
각도
( ” )
정격
총하중(t)
각도
( ” )
정격
총하중(t)
각도
( ” )
정격
총하중(t)
각도
( ” )
정격
총하중(t)
각도
( ” )
정격
총하중(t)
각도
( ” )
정격
총하중(t)
8.3 78.4 160.0
9 76.5 150.2 77.0 140.9
10 73.8 134.1 75.8 133.4 77.0 130.2 77.0 117.3
11 71.1 120.9 73.4 120.2 75.3 119.6 76.7 116.6 77.0 106.2
12 68.3 109.9 71.0 109.2 73.1 108.7 74.8 106.0 76.2 104.4 77.0 97.1 77.0 88.4
13 65.4 100.7 68.5 99.9 71.0 99.4 72.9 98.7 74.4 98.3 75.7 94.3 76.8 88.0 77.0 81.1
14 62.4 92.7 66.0 92.0 68.8 91.4 70.9 90.8 72.7 90.4 74.1 89.5 75.3 85.0 76.4 79.8 77.0 74.6
15 59.4 85.8 63.5 85.1 66.5 84.5 68.9 83.9 70.9 83.5 72.5 82.7 73.8 82.0 75.0 77.1 76.0 72.6
16 56.3 79.8 60.8 79.1 64.2 78.5 66.9 77.9 69.1 77.4 70.8 76.7 72.3 76.3 73.6 74.5 74.7 70.2
17 53.0 74.5 58.1 73.8 61.9 73.2 64.9 72.5 67.2 72.1 69.2 71.4 70.8 71.0 72.2 70.3 73.4 67.9
18 49.6 69.8 56.3 69.1 59.5 68.5 62.8 67.8 65.4 67.4 67.5 66.6 69.3 66.3 70.8 65.5 72.1 65.0
19 46.9 65.7 52.4 64.9 57.1 64.3 60.7 63.6 63.5 63.2 65.8 62.4 67.7 62.0 69.4 61.3 70.8 60.7
20 42.1 61.9 49.4 61.1 54.6 60.5 58.5 59.8 61.6 59.4 64.1 58.6 66.2 58.2 67.9 57.5 69.5 56.9
21 37.9 58.5 46.2 57.7 52.0 57.1 56.3 56.4 59.6 55.9 62.3 55.2 64.6 54.8 66.5 54.1 68.1 53.5
22 33.2 55.4 42.9 54.6 49.3 54.0 54.0 53.3 57.6 52.8 60.6 52.0 63.0 51.7 65.0 50.9 66.8 50.4
23 30.0 53.7 39.3 51.8 46.4 51.2 51.6 50.4 55.6 50.0 58.7 49.2 61.3 48.8 63.5 48.1 65.4 47.5
24 35.3 49.2 43.5 48.6 49.2 47.9 53.6 47.4 56.9 46.6 59.7 46.2 62.0 45.5 64.0 44.9
25 31.0 46.9 40.3 46.2 46.6 45.5 51.3 45.0 55.0 44.2 58.0 43.8 60.0 43.1 62.6 42.5
26 30.0 46.4 36.9 44.0 44.0 43.3 49.1 42.8 53.1 42.0 56.3 41.6 58.9 40.9 61.2 40.3
27 33.2 42.0 41.2 41.3 46.8 40.8 51.1 40.0 54.5 39.6 57.3 38.8 59.7 38.2
28 30.0 40.6 38.2 39.4 44.4 38.9 49.0 38.1 52.7 37.7 55.7 36.9 58.3 36.3
29 35.0 37.7 41.8 37.1 46.9 36.3 50.8 36.9 54.1 35.1 56.8 34.6
30 31.5 36.1 39.2 35.5 44.7 34.7 48.9 34.3 52.4 33.5 55.2 32.9
31 30.0 35.5 36.3 34.0 42.4 33.2 47.0 32.7 50.7 32.0 53.7 31.4
32 33.3 32.6 40.0 31.7 45.0 31.3 49.9 30.5 52.1 29.9
33 30.0 31.3 37.4 30.4 42.9 30.0 47.1 29.2 50.5 28.6
34 34.7 29.2 40.7 28.7 45.2 27.9 48.8 27.3
35 31.8 28.0 38.4 27.5 43.2 26.7 47.1 26.1
36 30.0 27.3 35.9 26.4 41.2 25.6 45.4 25.0
37 33.3 25.3 39.1 24.5 43.6 24.0
38 30.6 24.4 36.9 23.6 41.7 23.0
39 30.0 24.2 34.6 22.6 39.8 22.0
40 32.1 21.7 37.8 21.1
41 30.0 21.1 35.6 20.3
42 33.4 19.5
43 33.0 18.4


공사실적

  영광 대신항 보수 (주진건설)       2016년 04월 ~ 2016년 06월
  진도 조력발전 공사 (대하)       2016년 09월 ~ 2016년 11월
  영흥 화력발전 공사 (현대건설_관악산업)       2017년 05월
  서남해 해상풍력 실증단지 조성(현대건설_관악산업)       2017년 08월 ~ 2017년 10월, 2018년 05월 ~ 2018년 09월
  보령 화력 연료부두 축조공사 (현대스틸)       2018년 12월 ~ 현재 진행중